top of page
Search


WIP and Unbilled Work: How to Turn 'Work Done' into 'Cash Collected'
A firm can be busy and still feel short on cash.
That sounds backwards, but it happens all the time in architecture, engineering, construction, and interior design firms. The team is working. Projects are moving. Clients are asking questions, reviewing drawings, requesting changes, attending meetings, and getting real value from your people.

Reach CPA
10 min read


The 2-Hour Month-End Close for Project-Based Firms: A Weekly Set Up That Works
Get clean numbers faster so decisions don’t depend on intuition. A clean close does not have to mean a heavy process. For many small to mid-sized project firms, the best goal is simple: a weekly rhythm that makes a two-hour month-end close achievable.
Not perfect. Not overbuilt. Timely and consistent data is critical. It helps owners make decisions based on real numbers, not relying on gut feelings.

Reach CPA
7 min read
bottom of page
