Your 13-Week Cash Forecast is Wrong. That's Okay.
How Architecture and Engineering (A/E) firms can forecast when project schedules, WIP and client payments keep moving.
A 13-week cash forecast sounds straightforward.
List the money coming in. List the money going out. Look at the balance each week.
In an architecture or engineering firm, it is rarely that clean.

Reach CPA
5 min read


Fee Erosion in AEC Firms: Early Warning Signs + What to Do This Month
"Busy" is not the same as profitable. Catch margin leaks while there is still time to fix them.
A firm can be busy and still not be making the money it should be. This tends to catch AEC and design owners off guard. Picture it: the team is booked with projects moving along nicely. Invoices are going out and there is no obvious crisis. From the outside, the firm looks healthy.

Reach CPA
7 min read


WIP and Unbilled Work: How to Turn 'Work Done' into 'Cash Collected'
A firm can be busy and still feel short on cash.
That sounds backwards, but it happens all the time in architecture, engineering, construction, and interior design firms. The team is working. Projects are moving. Clients are asking questions, reviewing drawings, requesting changes, attending meetings, and getting real value from your people.

Reach CPA
10 min read


The 2-Hour Month-End Close for Project-Based Firms: A Weekly Set Up That Works
Get clean numbers faster so decisions don’t depend on intuition. A clean close does not have to mean a heavy process. For many small to mid-sized project firms, the best goal is simple: a weekly rhythm that makes a two-hour month-end close achievable.
Not perfect. Not overbuilt. Timely and consistent data is critical. It helps owners make decisions based on real numbers, not relying on gut feelings.

Reach CPA
7 min read